Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Bernold, L E (2003) Economic Model to Optimize Underground Utility Protection. Journal of Construction Engineering and Management, 129(06), 645–52.

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success Factors for ISO9000 Implementation. Journal of Construction Engineering and Management, 129(06), 599–609.

Chua, D K H, Tyagi, A, Ling, S and Bok, S H (2003) Process-Parameter-Interface Model for Design Management. Journal of Construction Engineering and Management, 129(06), 653–63.

Harmon, K M J (2003) Effectiveness of Dispute Review Boards. Journal of Construction Engineering and Management, 129(06), 674–9.

Hegazy, T and Kassab, M (2003) Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and Management, 129(06), 698–705.

Jaselskis, E J and El-Misalami, T (2003) Implementing Radio Frequency Identification in the Construction Process. Journal of Construction Engineering and Management, 129(06), 680–8.

  • Type: Journal Article
  • Keywords: Construction management; Contractors; Data collection; Automatic information systems; construction industry; transponders; management; identification technology; radiowaves; civil engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(680)
  • Abstract:
    This paper provides construction industry owners and contractors with information about enhancing their operations using radio frequency identification (RFID) technology. Radio frequency identification involves the use of tags, or transponders, that collect data and manage it in a portable, changeable database; communicate routing instructions and other control requirements to equipment; and can withstand harsh environments. A construction industry-RFID supplier workshop was held to disseminate information about this technology and to generate suitable application ideas for the industry. With the information gathered during the workshop, one application idea was selected and pilot tests conducted to learn more about RFID and its applicability to the material procurement process on a construction site. The pilot tests showed that RFID tags reduced the time required to download data into a company’s material tracking system and could “flag” an item so an entry was not repeated. When scanning the tags, sun glare was not a problem as compared to using bar code labels. Although further analysis is necessary, RFID did show promise of being a beneficial technology as it relates to the materials receiving process. A flowchart is provided to assist contractors and owners in selecting the appropriate RFID system.

Korman, T M, Fischer, M A and Tatum, C B (2003) Knowledge and Reasoning for MEP Coordination. Journal of Construction Engineering and Management, 129(06), 627–34.

Li, H, Kong, C W, Pang, Y C, Shi, W Z and Yu, L (2003) Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement. Journal of Construction Engineering and Management, 129(06), 689–97.

Mohamed, S (2003) Performance in International Construction Joint Ventures: Modeling Perspective. Journal of Construction Engineering and Management, 129(06), 619–26.

Moselhi, O and Hassanein, A (2003) Optimized Scheduling of Linear Projects. Journal of Construction Engineering and Management, 129(06), 664–73.

Sui Pheng, L and Hongbin, J (2003) Internationalization of Chinese Construction Enterprises. Journal of Construction Engineering and Management, 129(06), 589–98.

Yates, J K and Battersby, L C (2003) Master Builder Project Delivery System and Designer Construction Knowledge. Journal of Construction Engineering and Management, 129(06), 635–44.

Ye, S and Tiong, R L K (2003) Effects of Tariff Design in Risk Management of Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 129(06), 610–8.